Engineering risk advisory

Engineering advisory services in Kazakhstan.

Start with a defined output, timebox and fee. Expand into fieldwork, specialist studies or ongoing support only where the risk justifies it.

Request scope & fee
Engineering and cost specialists reviewing drawings, CAPEX and programme information

Starting packages

A credible first step without an open-ended mandate.

Published fees apply to the stated base scope, one decision question and adequate, searchable source information in English or Russian. After reviewing the source materials and available work window, ALMECO confirms the start date, delivery period and final fee in writing. Work begins only after written appointment, agreed advance payment and receipt of the required materials.

5 business daysKZT 2,550,000 · fixed for base scope

Project Entry Red-Flag Review

PDF decision memo, editable risk register, 30-minute management briefing and one clarification round.

One project or site; desktop review of up to 20 agreed core documents. Site visits, legal title opinions and specialist testing are excluded.

Request scope & fee for this service
3 business daysKZT 2,100,000 · fixed for base scope

Tender Health Check

2–4 page bid-gate memo, top-ten risks, RFI list and material assumptions / exclusions.

One tender and up to 200 pages of agreed core documents. Detailed pricing, full programme production and legal opinion are excluded.

Request scope & fee for this service
5 business daysKZT 2,100,000 / company

Local Partner Technical Evidence Screen

Official licence checks, one management interview, sample verification of key people, experience and resources, an evidence-gap matrix, red flags and recommended next checks.

One entity, based on supplied evidence and available official public registers. Not legal, AML, sanctions, credit or integrity due diligence.

Request scope & fee for this service
7 business daysKZT 3,000,000 · fixed for base scope

Permitting & Utilities Roadmap

Approval sequence, responsibility matrix, utility dependencies, evidence gaps and lead-time risks.

One Kazakhstan project and site; desktop baseline only. Applications, authority fees, surveys and formal approvals are excluded; authority or utility confirmations are quoted separately.

Request scope & fee for this service

Published advertising prices are stated in KZT and are current as of 29 August 2026. A contract with a non-resident client may be agreed in KZT or another permitted currency, with the amount and rate basis confirmed in ALMECO's written proposal. Applicable VAT and taxes are confirmed in that proposal. Larger document sets, multiple sites, entities or jurisdictions, non-searchable or untranslated records, extra meetings, fieldwork, specialist disciplines and third-party reliance may increase the fee. Unless expressly included, fees exclude applicable withholding, bank and intermediary charges, travel, translation, authority or utility charges, surveys, tests, purchased data and third-party professional fees. Expedited delivery, where capacity permits, is quoted separately and normally carries a 30% surcharge. No additional cost or material scope change proceeds without prior written approval.

Custom assignments

Broader support remains available—under a defined, written scope.

01

Kazakhstan Project Entry Sprint

7–12 business days · typically KZT 3.7–6.9 million. Wider red-flag, permitting, delivery-route and action-plan assignment.

02

Land & asset technical due diligence

Desktop TDD typically KZT 2.8–5.5 million; coordinated field and specialist TDD typically KZT 6.9–20.8 million+.

03

CAPEX & BoQ Risk Review

5–15 business days · typically KZT 2.3–4.6 million for a defined review; complex or detailed BoQ work is priced from KZT 5.8 million.

04

Full Technical Bid Desk

Typically KZT 3.7–11.6 million+. Compliance, RFI, assumptions, methodology, preliminary programme and local delivery inputs.

05

Project controls, QA/QC & Project Health

Setup typically KZT 2.3–5.5 million; monthly owner / lender support typically KZT 3.5–9.2 million after an initial diagnostic.

06

Claims / EOT technical support

Initial assessment typically KZT 2.3–4.6 million. Full chronology, delay or quantum work is scoped separately; not legal advice.

07

Pre-feasibility / TEO engineering workstream

From KZT 6.9 million for a defined engineering workstream—not a complete regulatory or bankable feasibility study. Includes concept, site, utilities, CAPEX, OPEX, schedule and implementation-risk inputs; finance, tax and legal advice remain with qualified advisers.

08

PPP / infrastructure technical screen

From KZT 5.8 million. Early technical, site, capacity, lifecycle and delivery-option work. Excludes legal structuring, financial modelling, VfM and fiscal-commitment advice.